Ausmini
It is currently Tue Apr 16, 2024 7:11 pm

All times are UTC + 10 hours




Post new topic Reply to topic  [ 25 posts ]  Go to page 1, 2  Next

How long should it take to get a NOS head ported & built ?
2 Weeks 25%  25%  [ 8 ]
1 Month 41%  41%  [ 13 ]
3 Months 13%  13%  [ 4 ]
6 Months 0%  0%  [ 0 ]
9 Months 0%  0%  [ 0 ]
1 Year 6%  6%  [ 2 ]
15 months ! 16%  16%  [ 5 ]
Total votes : 32
Author Message
PostPosted: Fri Nov 03, 2017 4:07 pm 
Offline
848cc
848cc
User avatar

Joined: Tue Mar 03, 2015 10:22 pm
Posts: 113
Location: Brisbane
Hi All,

I currently have a head sitting at a reputable company who had been suggested on here and other places as the best.

It's a blank NOS 12G940 head that needs a port, new valves, springs, collets, guides, etc to be fitted and assembled ready to bolt onto my block.

How long have you waited/what is a reasonable time frame for this type of work to be completed by a local machine shop these days ?

Cheers JR

_________________
1978 LS 1275


Top
 Profile  
 
PostPosted: Fri Nov 03, 2017 4:12 pm 
Offline
1275cc
1275cc
User avatar

Joined: Sun Apr 29, 2012 1:19 pm
Posts: 4349
Location: Wollongong, NSW
I had similar work done to a head this year (porting, chamber work, unleaded seats, valve guides, etc). It wasn't an urgent job but I got it back in about 3-4 months.

_________________
Image


Top
 Profile  
 
PostPosted: Fri Nov 03, 2017 5:18 pm 
Offline
998cc
998cc
User avatar

Joined: Sat Jul 23, 2011 9:32 pm
Posts: 1170
Location: Sydney (St George area)
You should of included a 24 month option.
How long is a piece of string?

_________________
http://www.flickr.com/by_dan
Current: 1970 Mini K 2014 Focus ST
Past: 93 Rover, 64 850, 97 Rover, 66 Deluxe, 66 Moke
81 Austin Estate, 2006 R53MCS, 66 Deluxe, 1978 Clubbie
2014 Land Rover Defender 90


Top
 Profile  
 
PostPosted: Fri Nov 03, 2017 6:25 pm 
Offline
1098cc
1098cc

Joined: Sat Jul 23, 2011 8:17 am
Posts: 1964
Location: san remo nsw
A week or find some one else............never say you're not in a rush, you'll never get it back.


Top
 Profile  
 
PostPosted: Fri Nov 03, 2017 8:32 pm 
Offline
998cc
998cc

Joined: Sat Nov 23, 2013 7:20 pm
Posts: 645
Location: Victoria
Two weeks max, but allow for a month. If not ready by then, tell em to stick it and go somewhere else. There's plenty of quality machine shops around which will gladly do the job.


Top
 Profile  
 
PostPosted: Fri Nov 03, 2017 9:02 pm 
Offline
1275cc
1275cc
User avatar

Joined: Fri May 02, 2008 3:07 pm
Posts: 5071
Location: The Internet
2 weeks from when they pull it down. Or up to 3 months from when you drop it off to them if its a busy workshop.


Top
 Profile  
 
PostPosted: Sat Nov 04, 2017 2:52 pm 
Offline
1275cc
1275cc

Joined: Sat Feb 09, 2013 5:44 pm
Posts: 2184
Location: Camden
18 months for unleaded inserts at a highly-respected (by some) and often-mentioned site here.


Top
 Profile  
 
PostPosted: Sat Nov 04, 2017 5:19 pm 
Offline
998cc
998cc

Joined: Sat Nov 23, 2013 7:20 pm
Posts: 645
Location: Victoria
Bill B wrote:
18 months for unleaded inserts at a highly-respected (by some) and often-mentioned site here.

That time frame is not on. I wouldn't wait that long. Plenty of good workshops around who would welcome the work and the turnaround would be pretty quick.


Top
 Profile  
 
PostPosted: Sat Nov 04, 2017 6:01 pm 
Offline
998cc
998cc
User avatar

Joined: Sat Jul 23, 2011 9:32 pm
Posts: 1170
Location: Sydney (St George area)
Minicooper4me wrote:
Bill B wrote:
18 months for unleaded inserts at a highly-respected (by some) and often-mentioned site here.

That time frame is not on. I wouldn't wait that long. Plenty of good workshops around who would welcome the work and the turnaround would be pretty quick.


I think 18 months is a perfect time frame if i were slowly restoring a car.

_________________
http://www.flickr.com/by_dan
Current: 1970 Mini K 2014 Focus ST
Past: 93 Rover, 64 850, 97 Rover, 66 Deluxe, 66 Moke
81 Austin Estate, 2006 R53MCS, 66 Deluxe, 1978 Clubbie
2014 Land Rover Defender 90


Top
 Profile  
 
PostPosted: Sat Nov 04, 2017 7:10 pm 
Offline
848cc
848cc
User avatar

Joined: Sun Jul 31, 2016 8:20 pm
Posts: 413
Location: Newcastle
I had a head done for a mazda, unleaded seats and all new springs and valve regrind, took 4 days.

Sent from my SM-G900I using Tapatalk

_________________
http://www.ausmini.com/forums/viewtopic.php?f=3&t=93352

If I'm carrying on like a pork-chop, I'm having a great time.

If I go very quiet there's a very good chance I broke something.


Top
 Profile  
 
PostPosted: Sat Nov 04, 2017 7:46 pm 
Offline
998cc
998cc

Joined: Fri Aug 30, 2013 8:59 pm
Posts: 1029
Location: Western Sydney
I think it really depends on what you agreed on with the machine shop.
I need it in two weeks, they agree, then two weeks it is.
I'm in no hurry, then your on the back of the que and every other job will come in front of you until they have "spare time".

_________________
Find a job you love and you will never have to go to work !


Top
 Profile  
 
PostPosted: Sun Nov 05, 2017 9:26 am 
Offline
1275cc
1275cc

Joined: Sat Feb 09, 2013 5:44 pm
Posts: 2184
Location: Camden
Minicooper4me wrote:
Bill B wrote:
18 months for unleaded inserts at a highly-respected (by some) and often-mentioned site here.

That time frame is not on. I wouldn't wait that long. Plenty of good workshops around who would welcome the work and the turnaround would be pretty quick.


I know that now.....


Top
 Profile  
 
PostPosted: Sun Nov 05, 2017 10:56 am 
Offline
998cc
998cc
User avatar

Joined: Sun Sep 11, 2005 12:41 pm
Posts: 904
Location: Bunbury WA
I get mine done locally takes about 2 weeks , but if they are too busy I get it done in Perth which is about 1 week :D

_________________
1965 Morris 850
1966 Morris Mini Minor
1967 Morris Cooper 'S'
1977 Leyland LS


Top
 Profile  
 
PostPosted: Sun Nov 05, 2017 10:03 pm 
Offline
1275cc
1275cc
User avatar

Joined: Mon Apr 26, 2004 6:31 pm
Posts: 4663
Location: Sydney - strangely, I am glad of the sight of hills!!
As always, you are best to sort any issues out with the business directly. Calling or dropping in often gets a better dialogue than emails or texts, so i would suggest that.

Remember the forum rules.

cheers
michael

_________________
the world is a book, and those who do not travel read only a page
66 Mini Minor sponsored by http://www.lifeonthehedge.com.au/ The Dog Harness Specialists
It was a pleasure ausmini. I'll miss all you misfits and reprobates ;-)


Top
 Profile  
 
PostPosted: Mon Nov 06, 2017 8:18 am 
Offline
998cc
998cc

Joined: Mon Apr 05, 2004 11:23 am
Posts: 580
Location: Eastern Melbourne
The machining work is a day's effort, the ordering for a specialist, a couple of hours tops but the porting is the killer. Use to do remanufacturing and the equipment makes it a walk in the park until you get to porting. These days a 5axis CNC would probably have the porting done in half a day.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 25 posts ]  Go to page 1, 2  Next

All times are UTC + 10 hours


Who is online

Users browsing this forum: 68+86auto, MAXRACER72 and 9 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  

© 2016 Ausmini. All garage work involves equal measures of enthusiasm, ingenuity and a fair degree of irresponsibility.