Finally took the first step to getting my mini on the track today (well it's catually the second, first was fittng the harness and seat properly and sticking number panels on the door, but that was easy.
Once again the value of good friends was on show with Garry allowing me to store the car in his workshop and let me me use all his tools and giving me assistance. The car will live in his workshop until Christmas eve when I hope to have the list of things finished in time for Santas arrival. The only thing that will not be done is the fitment of the roll cage which Bond roll bars will be doing early in the new year.
List of jobs to be done.
Fit LSD
Check ALL nuts and bolts.
Get some head work done
Modify Extractors (so you no llonger have to remove whole Exhaust sytem to get engine out.
Weld up cracked bulk head where engine steady bolts in.
Clea up engine bay
Remove brake booster and throw in bin
Replace all coper lines with stainless.
Braided fuel and brake lines throughout.
New rear ruibber cones (Maybe)
Batter kill switch (the big red key)
External Battery kill switch
front and rear tow hooks
Fire extinguisher
Small bit of floor welding
Lots of go fast stickers
So this thread continues to load quickly I am only posting links to pix.
http://www.shoalhaven.net.au/~nubtwo/barm/barm001.jpg
http://www.shoalhaven.net.au/~nubtwo/barm/barm002.jpg
http://www.shoalhaven.net.au/~nubtwo/barm/barm003.jpg
http://www.shoalhaven.net.au/~nubtwo/barm/barm004.jpg
http://www.shoalhaven.net.au/~nubtwo/barm/barm005.jpg
Please feel free to contribute as much input as you like.