I am manufacturing new hydro pipes and I need the distance from the back under floor panel to the start of the hydro nut it is approx 600mm measured from the horizontal. My old pipes were cut by a brake place to remove the nut looks like he cut back from the nut a long way back.The pipes were to short I am now making new ones, the old story do the job yourself. I bought a good tube bender from All Tools at Warners Bay it does a great job. The hydro pipes are not easy to do I have now figured out how to do them ,start from the front make your own templates of the bends I am now up to the last bends . Also put the nuts on when the pipe is straight. P7676 1 pipe 3m cost $28.
|